Lynkwell Announces Acquisition by Nayax. Read the Press Release →
Case Study

DC Station

10 DC fast chargers turn DC Station into a model for what the future of EV fueling can look like—reliable, sustainable, and welcoming.

Client:

Developer Bruce Volz

Location:

Northampton, MA
PlugShare
SNAPSHOT

Industry:

Convenience

Charging Access:

Public

Use Cases:

• Community charging opportunity • Fleet charging • Tourist and visitor parking

Hardware:

Ten (10) 180 kW DC Fast Charging Ports

Software:

ViaLynk by Lynkwell

Incentives (summary):

Make Ready Incentive $716,000

Overview

Developer Bruce Volz chose to install EV charging at DC Station in Northampton to create a modern, sustainable fueling hub that meets growing demand for fast, convenient charging. Inspired by his own EV experience, Volz designed the site to combine rapid Level 3 charging with solar power, local landscaping, and community amenities that make clean transportation both practical and enjoyable.

Working with Lynkwell made it possible to bring my vision for a modern, efficient fast-charging hub to life. Their expertise and collaborative approach helped turn DC Station into a model for what the future of EV fueling can look like—reliable, sustainable, and welcoming.

Tailored Solutions

A compact fast-charging solution designed to serve visiting drivers through Lynkwell’s ViaLynk platform.

Hardware

  • Ten (10) 180 kW DC Fast Charging Ports
  • Combined with solar power, local landscaping, and community amenities that make clean transportation both practical and enjoyable.
  • Reliable, serviceable hardware designed for long-term operation
  • Software

  • Real-time visibility into station status and performance
  • Simple pricing control with support for resident/visitor use cases
  • Guest Charging for app-free payments and a smoother driver experience
  • Remote monitoring and diagnostics to keep ports online
  • Rebates & Incentives

    This project leveraged available utility incentives to offset installation costs and accelerate deployment.

    Saved

    $716,000
    Make Ready Incentive
    See Similar Case Studies

    Bring reliable public charging to your destination.