...
Lynkwell Announces Acquisition by Nayax. Read the Press Release →
Case Study

City of Oswego

A network of 10 Level-2 chargers that lets residents and visitors charge while they shop, play, and explore the waterfront.

Client:

City of Oswego

Location:

Oswego, NY
Photo: Public domain, via Wikimedia Commons
SNAPSHOT

Industry:

Municipal

Charging Access:

Public

Use Cases:

• Community charging
• Tourist & visitor parking

Hardware:

Ten (10) Level-2 charging ports (6.656 kW each)

Software:

ViaLynk by Lynkwell

Incentives (summary):

Make-Ready $54,000

Overview

As part of a long-term strategy to position Oswego for future success, planning for EV charging began in 2022. To accommodate growing demand and enhance accessibility for residents and visitors, charging stations were installed at high-traffic, community-oriented locations—including the lakeside park, ice rink, city pool, and downtown district. The project elevates Oswego as a forward-thinking community destination that meets the evolving needs of today’s drivers.

Our mission is to strategically position Oswego for success in the long term, and what better way to do that than to embrace the rise in popularity of electric vehicles and to better accommodate our residents who may already have electric vehicles.

Tailored Solutions

A simple and scalable Level-2 solution paired with management software that’s easy for municipalities to operate.

Hardware

  • 10 public Level-2 charging ports (~6.65 kW each)
  • Strategic placement at community hubs for maximum convenience and visibility
  • Modular, serviceable hardware designed for uptime and smooth on-site operations
  • Software

  • Real-time visibility into station status and performance
  • Simple pricing control with support for resident/visitor use cases
  • Guest Charging for app-free payments and a smoother driver experience
  • Remote monitoring and diagnostics to keep ports online
  • Rebates & Incentives

    These programs reduced up-front cost and accelerated deployment without compromising quality or the driver experience.

    Saved

    $54,000
    Make-Ready Incentive
    See Similar Case Studies

    Bring reliable public charging to your community.