Lynkwell Announces Acquisition by Nayax. Read the Press Release →
Case Study

Town of Marlborough

The Town of Marlborough, NY embraced EV charging stations as a practical step toward community sustainability, recognizing that supporting alternative transportation aligns with long-term environmental goals.

Client:

Location:

Marlborough, NY
SNAPSHOT

Industry:

Municipal

Charging Access:

Public

Use Cases:

• Community charging opportunity • Resident amenity • Tourist and visitor parking • Fleet charging

Hardware:

• Six (6) 240 kW DC Fast Charging Ports

Software:

ViaLynk by Lynkwell

Incentives (summary):

Make Ready Incentive $453,600

Overview

The Town of Marlborough, NY embraced EV charging stations as a practical step toward community sustainability, recognizing that supporting alternative transportation aligns with long-term environmental goals. The town saw an opportunity to modernize public infrastructure at no direct cost to taxpayers — turning skepticism into momentum and positioning Marlborough as a forward-thinkin

Lynkwell has not disappointed the CAC in making our EV Charging Station a reality in our town. As a Climate Smart Community, this action supports New York State's commitment to address the effects of climate change while providing our citizens and visitors a relaxing stop by the pond at our town park. This is such a win/win for all.

Tailored Solutions

A high-powered, publicly accessible EV charging solution designed to support the Town of Marlborough’s sustainability initiatives.

Hardware

  • Six (6) 240 kW DC Fast Charging Ports
  • Robust, serviceable hardware engineered for reliable long-term operation
  • Software

  • Real-time visibility into station status and performance
  • Simple pricing control with support for resident/visitor use cases
  • Guest Charging for app-free payments and a smoother driver experience
  • Remote monitoring and diagnostics to keep ports online
  • Rebates & Incentives

    This project leveraged available utility incentives to offset installation costs and accelerate deployment.

    Saved

    $453,600
    Make Ready
    See Similar Case Studies

    Bring reliable public charging to your Municipal destination.